Petition of the Electricity Act for extension of timelines of Connectivity and LTA for its Solar Power Project at Nokh Solar Park – EQ
0
0
Petition of the Electricity Act for extension of timelines of Connectivity and LTA for its Solar Power Project at Nokh Solar Park
For more information please see below link:
Related posts:
- Petition of the Central Electricity Regulatory Commission (Connectivity and General Network Access) and (Conduct of Business) Regulations, 2023 – EQ
- Petition of the CERC (Connectivity and General Network Access) Regulations of this Commission’s :Power to Relax” and “Power to Remove Difficulty” – EQ
- Petition with the CERC (Connectivity and General Network access to the Inter- State Transmission System) Regulations, 2022 – EQ
- Petition of the Power Purchase Agreement for the development of 300 MW (reduced to 150 MW) ISTS connected Solar power project of Change in Law events – EQ


