Petition for the Adoption of the tariff of Solar PV Power Projects (Tranche xviii) connected to the inter-state transmission system (ISTS) – EQ
Petition for the Adoption of the tariff of Solar PV Power Projects (Tranche xviii) connected to the inter-state transmission system (ISTS)
For more information please see below link:


