Supply, installation, testing and commissioning of 175 kWp Grid Interactive Solar Photovoltaic System (without battery back-up) in WRPL including Comprehensive AMC for 5 years (Group E- 40 kwp Koyali)
38
0
PWRJT17048_5/Supply, installation, testing and commissioning of 175 kWp Grid Interactive Solar Photovoltaic System (without battery back-up) in WRPL including Comprehensive AMC for 5 years (Group E- 40 kwp Koyali)
For more information please see below link:
Related posts:
- Haryana 150MW Solar PV Tender Bidding Results
- PROVISION OF SOLAR POWER PLANT AT AFS SAMANA
- Supply, installation and COMC (5 years) “Solar Hand Pumps” for Project Affected area of Talaipalli Coal Mining Project, Raigarh (CG)
- GAIL Announces Tender for Approx. 3.2 MW of Rooftop Solar Projects At Various Locations


