1. Home
  2. Tag "8 MW"

Tripura Surpasses 8 MW Solar Capacity, Marking a Key Renewable Energy Breakthrough – EQ

In Short : Tripura has crossed 8 MW of installed solar power generation capacity, marking a significant milestone in its renewable energy journey. The achievement reflects the state’s steady push toward clean energy adoption, reduced dependence on conventional power sources, and improved energy security. The expansion strengthens sustainability goals while supporting decentralized and environmentally responsible […]

JK Tyre Approves ₹5.04 Crore Investment in Solar Company Sunpulse Power – EQ

Jodhpur Discom Advances Rural Solar Push with 8 MW Project Tender – EQ

In Short : Jodhpur Discom has invited price bids for developing 8 MW of solar power projects under the PM-KUSUM scheme’s Component-A. The initiative aims to encourage decentralized solar energy generation for agricultural use. Developers will set up solar plants on barren or cultivated land, helping reduce grid dependency, cut emissions, and provide sustainable power […]

India Achieves Lowest Green Hydrogen Price, Moves Closer to $2/kg Target – EQ

Order on approval of the PPA for the 8 MW Small Hydro Project (SHP) developed by M/s Anakampoil Power Private Limited at Chaliar – M/s Anakampoil Power Private Ltd – EQ

Order on approval of the PPA for the 8 MW Small Hydro Project (SHP) developed by M/s Anakampoil Power Private Limited at Chaliar – M/s Anakampoil Power Private Ltd For more information please see below link:

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for determination of levelized tariff for “8 MW Ground Mounted Solar Photo Voltaic Power Project” at DVC Panchet, West Bengal. DVC – EQ

Petition for determination of levelized tariff for “8 MW Ground Mounted Solar Photo Voltaic Power Project” at DVC Panchet, West Bengal. DVC For more information please see below link:

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Damodar Valley Corporation Issue Tender for O and M of 8 MW (AC) Grid Tied Ground Mounted Solar PV Power Plant at DVC Konar, Dist.-Hazaribagh in the state of Jharkhand – EQ

Damodar Valley Corporation Issue Tender for O and M of 8 MW (AC) Grid Tied Ground Mounted Solar PV Power Plant at DVC Konar, Dist.-Hazaribagh in the state of Jharkhand For more information please see below link:

NGEL issue Tender for Setting up of project(s) in India first Green Hydrogen Hub at Pudimadaka (near Visakhapatnam), Andhra Pradesh – EQ

Airports Authority of India Issue Tender for Supply of 8 MWp solar power plant in Hubballi Airport to feed all Airports in Karnataka – EQ Mag

Airports Authority of India Issue Tender for Supply of 8 MWp solar power plant in Hubballi Airport to feed all Airports in Karnataka. For more information please see below link:

NGEL issue Tender for Setting up of project(s) in India first Green Hydrogen Hub at Pudimadaka (near Visakhapatnam), Andhra Pradesh – EQ

MPUVNL Issue Tender for RFS For Selection of RPGs for Implementation of approximate 8 MW of Grid Connected Solar PV Systems for Sale of Solar Power – EQ Mag Pro

MPUVNL Issue Tender for RFS For Selection of RPGs for Implementation of approximate 8 MW of Grid Connected Solar PV Systems for Sale of Solar Power o MPPMCL under feeder solarization component of PM KUSUM-C near Sanchi in the state of Madhya Pradesh, India.  For more information please see below link:

NGEL issue Tender for Setting up of project(s) in India first Green Hydrogen Hub at Pudimadaka (near Visakhapatnam), Andhra Pradesh – EQ

Important: Re-scheduling of Site-visit and Pre-bid meeting for the 8 MW Waste to Energy Project in Kanpur – EQ Mag Pro

This is in reference to the RfS issued for setting up of 8 MW Waste-to-Energy Project in Kanpur. Joint site-visit followed by pre-bid meeting for the Project have been postponed. Revised schedule to be intimated shortly. Prospective bidders interested to participate in the same are required to inform by intimating the names and email ids of respective participants (maximum […]

The Evolving Spectrum of Energy Sources – EQ