Status of allocation of bay(s) at the existing or the proposed ISTS sub-stations for Stage-II Connectivity – EQ Mag April 10, 2023 Anand Gupta 000 Featured Status of allocation of bay(s) at the existing or the proposed ISTS sub-stations for Stage-II Connectivity. For more information please see below link: Read more Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ