In the Matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations under System Strengthening Scheme in Northern Region–XXXVII (NRSS-XXXVII) – EQ

Summary: — **Key Dates & Delays** – **Asset-1:** SCOD – 19.12.2019, COD – 4.12.2022 → **Time overrun: 1081 days** – **Asset-2:** COD claimed as 5.1.2023 → Delay due to unready downstream asset by PTCUL. – **Asset-3:** COD claimed as 5.1.2023 → Delay due to washed-out bridge preventing reactor relocation. **PGCIL’s Claims** – **Asset-2:** COD claimed […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff from COD under TSA with Mundra Ultra Mega Power Project – EQ

Summary: — # **1. Scope of Work** The bidder must execute the *complete* EPC + long-term O&M responsibility for: ### **🔹 10 MW Rooftop Solar PV System (Jodhpur District)** * Installation on multiple State Government office buildings, institutional buildings, and other public structures. * Project includes design, engineering, supply, installation, net-metering, commissioning, and maintenance for […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ