Declaration of COD of Entire Capacity of 20 MW Auraiya Floating Solar PV Project: NTPC – EQ Mag Pro September 16, 2022 Anand Gupta 000 Featured Declaration of COD of Entire Capacity of 20 MW Auraiya Floating Solar PV Project: NTPC For more information please see below link: Read more Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ