1. Home
  2. Tag "BATHYMERIC SURVEY"

BHEL Floats Tender for Survey of 100 MW Solar Power Plant At NTPC Ramagundam

CONDUCTING GEOTECHNICAL INVESTIGATION AND BATHYMERIC SURVEY WORKS OF THE WATER BODY FOR PROPOSED PROJECT SITE OF FLOATING SOLAR POWER PLANT OF 100 MW AT NTPC RAMAGUNDAM (TELANGANA) For more information please see below link:

SJVN Ltd issue Tender for Setting up of cumulative capacity of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ