1. Home
  2. Tag "CENTRAL ELECTRICITY REGULATORY COMMISSION"

Petition for approval of introduction of the Green Term-Ahead Market (RE) Contracts at PXIL

Petition under Section 66 of the Electricity Act, 2003 read with the Regulations 6 and 7 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 for approval of introduction of the Green Term-Ahead Market (Renewable Energy) Contracts at Power Exchange India Limited. Power Exchange India Limited For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition for the PPAs executed between the Adani Wind Energy and SECI

Petition under Section 79 of the Electricity Act, 2003 read with Articles 11 and 13 of the Power Purchase Agreements dated 28.6.2018 executed between the Petitioner and Solar Energy Corporation of India Limited. Adani Wind Energy Kutchh One Limited (AWEKOL) For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition for adoption of tariff for 840 MW Wind-Solar Hybrid Power Projects (Tranche-I) connected to ISTS 

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 840 MW Wind-Solar Hybrid Power Projects (Tranche-I) connected to the Inter-State Transmission System and selected through competitive bidding process as per the Guidelines issued by Ministry of New and Renewable Energy dated 25.5.2018. Solar Energy Corporation of India Limited For more […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Approval of Revised Procedure for “Grant of Connectivity to projects based on RE sources to ISTS”

Approval of Revised Procedure for Grant of Connectivity Guidelines for ISTS-Connected Renewable Projects In the matter of: Approval of Revised Procedure for “Grant of Connectivity to projects based on renewable sources to inter-State transmission system” under Regulation 27 of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Determination of Point of Connection (PoC) rates for the period of October 2020 to November 2020

Determination of Point of Connection (PoC) rates for the period of October 2020 to November 2020 in accordance with Regulation 17(2) of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and amendments thereto. For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition for grant of registration to establish and operate a Power Exchange 

CERC proposes to grant registration to Pranurja Solutions to establish and operate a power exchange Petition for grant of registration to establish and operate a Power Exchange Petition under Regulation 16 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 as amended, for grant of registration to establish and operate a Power Exchange in […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

CERC Rejected Petition of Renew Sun Waves to transfer Connectivity and LTA

Petition under Section 79(1)(c) of the Electricity Act, 2003 read with section 79(1)(k) of the Electricity Act, 2003 along with regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, seeking appropriate direction(s) and / or order(s) from the Commission in relation to provisions of the Central Electricity Regulatory Commission (Grant of […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

In the matter of: Application for recoupment of under-recovered energy charges due to shortfall in energy generation

In the matter of: Application under Regulation-31(6) of CERC (Terms and Conditions of Tariff) Regulations, 2014 for recoupment of under-recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2016-17 in respect of Chamera-II Power Station. For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition for adoption of tariff for 3000 MW Grid Connected Solar PV Power Projects

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 3000 MW Grid Connected Solar PV Power Projects selected through Competitive Bidding Process as per the Guidelines issued by Ministry of New and Renewable Energy on 10.3.2015. For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition for adoption of tariff for 1150 MW Solar PV Power projects (Tranche-IV)

  Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 1150 MW Solar PV Power projects (Tranche-IV) connected to the Inter-State Transmission system (ISTS) and selected through competitive bidding process as per the Standard Bidding Guidelines dated 3.8.2017. Solar Energy Corporation of India Limited For more information please see below […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ