Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 771/AT/2025 – **Subject**: Petition under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects** connected to the **inter-State Transmission System (ISTS)**, selected through competitive bidding. – **Petitioner**: **NTPC Limited** – **Respondents**: **Adani Renewable Energy Holding Twelve Limited […]

Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region – EQ

Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region – EQ

Summary: — ### **1. Case Details** – **Hearing Date**: 27.11.2025 – **Bench**: Shri Ramesh Babu V. (Member) and Shri Harish Dudani (Member) – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: Various state power distribution/management companies (e.g., MPPMCL, APDCL, etc.) — ### **2. Petitions Involved** Five separate petitions were heard together: | Petition […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 80/TT/2025 – **Subject**: Determination of **Transmission Tariff** for assets under the **Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II-Part B1**. – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: **Ajmer Vidyut Vitran Nigam Limited […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Summary: —- **KEY PROCEEDINGS:** 1. **Name Change of Petitioner:** – Petitioner’s representative informed the Commission that the process of changing the company’s name is ongoing. – Requested permission to file an affidavit with supporting documents regarding the name change. 2. **Commission’s Direction:** – Petitioner permitted to file an affidavit within **one week**, placing on record […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff for 2014-19 tariff period – EQ

Summary: —- **BACKGROUND:** – **Remand Order:** Appellate Tribunal for Electricity (APTEL) remanded back CERC’s earlier order dated 29.6.2018. – **Reason for Remand:** APTEL directed re-determination of tariff based on: 1. Actual capital cost 2. Legitimate weighted average interest on loan (WAROI) 3. Grossed-up return on equity based on true effective tax rates 4. Correct useful […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited – EQ

Summary: —- **KEY POINTS OF PROCEEDINGS:** 1. **Interim Application (IA 97/2025) – Allowed** • Petitioner’s application for amendment of prayers in Petition granted. • Amended petition taken on record; IA disposed of. 2. **Directions to Respondents** • Respondents granted **final opportunity** to file replies within **7 days** (copy to Petitioner). • Petitioner may file rejoinder […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for Truing up and determination of transmission tariff for Bawana – Mandaula Double Ckt. and Bamnauli – Ballabhgarh Double Ckt. transmission lines – EQ

Summary: — ### **1. Background** * The matter relates to a petition filed before the **Central Electricity Regulatory Commission (CERC)** by **Delhi Transco Limited (DTL)**. * The petition seeks **truing-up of transmission tariff for the 2019–24 control period** and **determination of tariff for the 2024–29 period**. * The assets involved are: * **400 kV Bawana […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for Truing up and determination of transmission tariff for “SYSTEM STRENGTHENING–XX” in the Southern Region of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) – EQ

Summary: — ### **1. Introduction & Case Overview** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Subject:** Petition for truing up of transmission tariff for the period **2019–24** and determination of transmission tariff for the period **2024–29** for **Combined Assets** under the “System Strengthening–XX” scheme in the Southern Region. – **Legal Basis:** Electricity […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for determination of tariff for the asset under “Eastern Region Expansion Scheme – XXVIII (ERES-XXVIII)” of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations – EQ

Summary: — ### **Regulatory Context** * The Central Electricity Regulatory Commission (CERC) heard **five transmission tariff petitions** filed by **Power Grid Corporation of India Ltd. (PGCIL)**. * Proceedings relate to **tariff determination and truing-up** under **Section 62 of the Electricity Act, 2003**. * Applicable tariff regulations include **CERC Tariff Regulations, 2019 and 2024**. * **Date […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

In the matter of Approval of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of transmission tariff for “Combined asset under URI- II HEP Transmission System” in the Northern Region – EQ

Summary: — ### **1. Regulatory Outcome** * CERC has **approved truing-up of transmission tariff for FY 2019-24** and **determined tariff for FY 2024-29**. * Applicable to **Combined Asset under URI-II HEP Transmission System** in the **Northern Region**. * Order dated **5 December 2025**. — ### **2. Project & Asset Overview** * **Asset Owner:** Power Grid […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ