Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Summary: — ### **List of Petitions Covered** | Petition No. | Subject / Scheme | Region | Main Respondent | |————-|——————|——–|—————-| | 403/TT/2025 | Western Region System Strengthening Scheme (XVIII) | Western | MPPMCL + 6 others | | 544/TT/2025 | Transmission System Strengthening in Wardha-Aurangabad Corridor for IPP projects in Chhattisgarh (IPP-G) | Western […]

Petition for determination of transmission tariff under the transmission system associated with the “North East Northern/Western Interconnector-I Project” in the North-Eastern Region – EQ

Petition for determination of transmission tariff under the transmission system associated with the “North East Northern/Western Interconnector-I Project” in the North-Eastern Region – EQ

Summary: — **Case Details** – **Petition No:** 211/TT/2024 – **Subject:** Determination of transmission tariff from COD/Proposed COD/Anticipated COD to 31.03.2024 for **4 transmission assets** under the *North East Northern/Western Interconnector-I Project* in the North-Eastern Region – **Petitioner:** PGCIL – **Respondents:** Assam Power Distribution Company Limited (APDCL) and 8 others – **Date of Hearing:** 27.11.2025 – […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for determination of transmission tariff from the COD to System Strengthening Scheme in the Northern Region–XXXVII (NRSS-XXXVII) – EQ

Summary: — **Case Details** – **Petition No:** 330/TT/2023 – **Subject:** Determination of transmission tariff from the Commercial Operation Date (COD) to 31.03.2024 for three assets under the *System Strengthening Scheme in the Northern Region–XXXXII (NRSS-XXXVII)* – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Respondents:** Power Transmission Corporation of Uttarakhand Limited (PTCUL) and 15 […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for the determination of transmission tariff under Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part F1 – EQ

Summary: —- **Subject of Petition:** Power Grid Corporation of India Limited (PGCIL) has filed a petition for **determination of transmission tariff** from the Date of Commercial Operation (DOCO) until **31 March 2024** for specific transmission assets under a **renewable energy evacuation scheme** in Rajasthan. **Assets Involved:** – **Substation:** 400kV Bikaner-II Pooling Station (PS) – extension […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for Truing up and for the determination of transmission tariff for Uravakonda-Veltoor, Kamavarapukota-Suryapet I & II lines for tariff period – EQ

Summary: —- **Key Entities:** – **Petitioner:** APTRANSCO (Transmission Corporation of Andhra Pradesh Limited) – **Respondents:** Transmission Corporation of Telangana Limited (TSTRANSCO) and another (likely CTUIL – Central Transmission Utility of India Ltd.) – **CTUIL** was present at the hearing as Respondent No. 2. **Date of Hearing:** 20 November 2025 **Proceedings Summary:** 1. The petitioner’s counsel […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) under “Gazuwaka HVDC back to back project” in the Southern Region – EQ

Summary: — ## 📋 **Case Overview** – **Petition No.**: 495/TT/2025 – **Petitioner**: Power Grid Corporation of India Limited (PGCIL) – **Subject**: – Truing up of transmission tariff for **2019–24** – Determination of transmission tariff for **2024–29** – Assets involved: – **Asset-1**: 400 kV Joypore-Gazuwaka transmission line with bays – **Asset-2**: 500 MW HVDC back-to-back stations […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for Truing up and determination of transmission tariff for Assets Palatana-Bongaigaon Transmission System Project in the North Eastern Region – EQ

Summary: — ## 📋 **Case Overview** – **Petition No.**: 383/TT/2025 – **Petitioner**: North East Transmission Company Limited (NETC) – **Subject**: Truing up of transmission tariff for **2019–24** and determination of tariff for **2024–29** for the **400 kV Palatana-Bongaigaon Transmission System Project** in the North Eastern Region. – **Date of Hearing**: 20 November 2025 – **Commission […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition of the CERC (Conduct of Business) Regulations for review of the Order – EQ

Summary: —- **Parties:** – **Petitioner:** Power Grid Corporation of India Limited (POWERGRID) – **Respondents:** Bihar State Power Holding Company Limited (BSPHCL) and 5 Others **Subject:** Review Petition filed under **Section 94(1)(f) of the Electricity Act, 2003** read with **Regulation 52 of CERC (Conduct of Business) Regulations, 2023**, seeking review of the **Order dated 13.6.2025** passed […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Draft CERC(Terms and Conditions of Tariff) (Second Amendment) Regulations, 2025 – EQ

Summary: — ### **Key Points:** 1. **Legal Basis:** Prepared under Section 178(2)(s) of the Electricity Act, 2003, read with Sections 61 and 62. 2. **Document Availability:** The draft regulations are available on the CERC website: [www.cercind.gov.in](http://www.cercind.gov.in). 3. **Invitation for Stakeholder Feedback:** – Views/comments/suggestions/objections are invited from stakeholders and interested persons. – Submissions must include **1 […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur, (PGCIL)-Muzaffarpur BSEB), Muzaffarpur-Gorakhpur, Gorakhpur-Lucknow and Bareilly-Mandola Transmission Line – EQ

Summary: —- Petition for: 1. Truing up of transmission tariff for the tariff period **2019–24**, and 2. Determination of transmission tariff for the tariff period **2024–29** for **Combined Assets** comprising: – **Eastern Region:** – 400 kV D/C Siliguri–Purnea Transmission Line – 400 kV D/C Purnea–Muzaffarpur Transmission Line – 220 kV D/C Muzaffarpur (PGCIL)–Muzaffarpur (BSEB) Transmission […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ