1. Home
  2. Tag "comments/ suggestions/objections"

Inviting comments/suggestions/objections on Draft DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026 – EQ

Summary: —- ### Key Business Points #### 1. What is Being Proposed? DERC has prepared **draft amendments** to the existing “Terms and Conditions for Green Energy Open Access” regulations. These amendments will modify the rules governing how consumers in Delhi can access green (renewable) energy through open access – i.e., purchasing renewable power directly from […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Inviting comments/suggestions/objections on Draft DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026 – EQ

Summary: —- **on the Draft Amendment Regulations** ### Submission Deadline **Latest by 05 May 2026** ### Submission Mode | Mode | Details | |——|———| | **Post** | To the address of DERC (not specified in extract – refer to DERC website/office address) | | **Email** | jdpse@derc.gov.in (to the attention of Joint Director (PS&E)) | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Inviting comments/suggestions/objections on Draft DERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2026 – EQ

Summary: —- ### 1. Key Proposed Amendment: Removal of Voltage Barrier The draft amendment deletes the voltage-related condition from the definitions of “Entity” and “Green Energy Open Access Consumer” as well as from Regulation 8(a) of the principal 2024 regulations . | **Current Rule (2024 Regulations)** | **Proposed Amendment (2026)** | | :— | :— […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Commission invites Comments/ Suggestions/ Objections in the matter of Procurement of 1045 MW Solar power from NTPC under CPSU Scheme Phase-II Tranche-III, 500 MW Solar power from NHPC – EQ Mag Pro

Commission invites Comments/ Suggestions/ Objections in the matter of Procurement of 1045 MW Solar power from NTPC under CPSU Scheme Phase-II Tranche-III, 500 MW Solar power from NHPC. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ