1. Home
  2. Tag "Commissioning"

Petition of GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of unforeseen and uncontrollable events – EQ

Petition of GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of unforeseen and uncontrollable events For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

India allows extension for commissioning of certain solar power projects until December – EQ

In Short : India has extended the commissioning deadline for select solar power projects until December. The decision, aimed at aiding developers facing delays from supply chain and logistical challenges, applies to projects under specific government schemes. This move helps prevent penalties and supports timely project completion amid ongoing disruptions. Official guidelines detail eligibility and […]

RBI MPC Member Stresses Energy Security as Key to Sustaining India’s Growth Momentum – EQ

Sineng Electric Enhances Grid Stability with Commissioning of 150MW/300MWh Energy Storage Project – EQ

Huaian – Energy storage istransformingthe electrical grid, serving as a vital enabler of renewable energy integration by mitigating the intermittency of solar and wind power. Committed to pioneering energy storage innovations, Sineng Electric has deployed its high-power central PCS in a 150MW/300MWh energy storage project in Huaian, China. The project utilizes battery energy storage system […]

How governments can best support consumers during this energy crisis – EQ

Petition of ‘Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects with the Scheduled Date of Commissioning its 70 MW Hybrid Power Plant located at Village Dwarka, Gujarat – EQ

Petition of ‘Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects with the Scheduled Date of Commissioning its 70 MW Hybrid Power Plant located at Village Dwarka, Gujarat For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the GERC (Conduct of Business) Regulations 2004 for extension of time period for commissioning the entire evacuation line – EQ

Petition of the GERC (Conduct of Business) Regulations 2004 for extension of time period for commissioning the entire evacuation line For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Ministry of Railways issue Tender for Supply, installation, testing &amp commissioning of 827 KW grid connected solar plant at various locations over division – EQ

Ministry of Railways issue Tender for Supply, installation, testing &amp commissioning of 827 KW grid connected solar plant at various locations over division For more information please see below link:

NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ

Assam Floats Tender For 100 MWAC Solar PV Projects (followed by e-reverse auction)

Assam Floats Tender For 100 MWAC Solar PV Projects (followed by e-reverse auction) RFS for Procurement of 25 MWAC Solar Power from Grid Connected Solar PV Projects to be developed in Region-4 (CACHAR, HAILAKANDI, KARIMGANJ) through tariff based competitive bidding process (followed by e-reverse auction). For more information please see below link: RFS for Procurement of […]

NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ