1. Home
  2. Tag "Darlipali Super Thermal Power Station Stage-I"

Petition for approval of tariff of Darlipali Super Thermal Power Station Stage-I (2×800 MW) for the period from COD of Unit-I (i.e. 1.3.2020) to 31.3.2024 – NTPC Limited – EQ Mag

Petition for approval of tariff of Darlipali Super Thermal Power Station Stage-I (2×800 MW) for the period from COD of Unit-I (i.e. 1.3.2020) to 31.3.2024 based on audited financial accounts as on actual COD of Unit-1. NTPC Limited. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ