Petition for truing up and the determination of transmission tariff for Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Southern Region – EQ

Summary: — ## 📄 **Case Details** – **Petition No.**: 606/TT/2025 – **Petitioner**: Power Grid Corporation of India Limited (PGCIL) – **Respondents**: Tamil Nadu Generation and Distribution Corporation (TANGEDCO) and 15 Others – **Date of Hearing**: 11.12.2025 – **Bench**: Shri Ramesh Babu V. (Member), Shri Harish Dudani (Member) — ## 🧾 **Subject of Petition** PGCIL filed […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of Transmission System for Transfer of Power from generation projects in the Eastern Region – EQ

Summary: — ## 📄 **Case Details** – **Petition No.**: 337/TT/2022 – **Petitioner**: Power Grid Corporation of India Limited (PGCIL) – **Respondents**: Bihar State Power (Holding) Company Limited (BSPHCL) and Others – **Date of Hearing**: 11.12.2025 – **Bench**: Shri Ramesh Babu V. (Member), Shri Harish Dudani (Member) — ## 🧾 **Subject of Petition** PGCIL sought approval […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for the determination of transmission tariff for asset under ‘Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B” in the Western Region – EQ

Summary: —- Document 1: CERC Hearing Proceedings (875/TT/2025) Key Proceedings: Petitioner’s Submission: PGCIL filed for tariff determination for the 2024-29 period. MSEDCL’s Request: Respondent No. 2 (MSEDCL) sought 4 weeks to file a reply. Commission’s Directions: PGCIL to implead CTUIL as a party and file a revised memo within a week. Issue notice to all […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region – EQ

Summary: — ### **1. Case Details** – **Hearing Date**: 27.11.2025 – **Bench**: Shri Ramesh Babu V. (Member) and Shri Harish Dudani (Member) – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: Various state power distribution/management companies (e.g., MPPMCL, APDCL, etc.) — ### **2. Petitions Involved** Five separate petitions were heard together: | Petition […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 80/TT/2025 – **Subject**: Determination of **Transmission Tariff** for assets under the **Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II-Part B1**. – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: **Ajmer Vidyut Vitran Nigam Limited […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff for 2014-19 tariff period – EQ

Summary: —- **BACKGROUND:** – **Remand Order:** Appellate Tribunal for Electricity (APTEL) remanded back CERC’s earlier order dated 29.6.2018. – **Reason for Remand:** APTEL directed re-determination of tariff based on: 1. Actual capital cost 2. Legitimate weighted average interest on loan (WAROI) 3. Grossed-up return on equity based on true effective tax rates 4. Correct useful […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited – EQ

Summary: —- **KEY POINTS OF PROCEEDINGS:** 1. **Interim Application (IA 97/2025) – Allowed** • Petitioner’s application for amendment of prayers in Petition granted. • Amended petition taken on record; IA disposed of. 2. **Directions to Respondents** • Respondents granted **final opportunity** to file replies within **7 days** (copy to Petitioner). • Petitioner may file rejoinder […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

CSERC (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2025 – EQ

Summary: —- **1. Scope of Application:** The Regulations apply to the following entities operating in Chhattisgarh: * State Transmission Utility * Generating companies (supplying power to distribution licensees in the state under long-term agreements, except stations under central jurisdiction and certain renewable energy stations) * All intra-state transmission licensees * All distribution licensees * State […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Draft CSERC (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2025 – EQ

Summary: — ## **PART 1: INTRODUCTION & SCOPE** ### **1.1 Legal Basis & Commencement** * **Enacted under:** Sections 61, 62, 181(2), and 32(3) of the Electricity Act, 2003. * **Control Period:** April 1, 2026, to March 31, 2030. * **Applicability:** Extends to the entire state of Chhattisgarh. ### **1.2 Regulated Entities** The regulations apply to: […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Truing up and determination of transmission tariff for Raipur Pooling Station (Powergrid) for Raipur PS (Powergrid)-Rajnandgaon for Chhattisgarh IPPs (Part-B)” in the Western Region – EQ

Summary: — ### **1. Background** * The petition is before the **Central Electricity Regulatory Commission (CERC)** and pertains to **truing-up of transmission tariff for the 2014–19 period** and **determination of tariff for the 2019–24 period**. * The assets involved are **two 765 kV line bays at the 765/400 kV Raipur Pooling Station (Powergrid)** associated with […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ