1. Home
  2. Tag "EXTENSION"

Case Filed by Kalika Steel Alloys and 27 Others Seeking Appropriate Directions Pertaining to the Revision in Contract Demand of Earlier Orders

Case filed by Kalika Steel Alloys Pvt Ltd and 27 others seeking appropriate Orders/directions pertaining to the revision/ change in Contract Demand /extension of the earlier Orders in Case No 137 of 2020. For more information please see below link:

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Petition by GIFT Power for Extension of Existing PPA With M/s PTC India

In the Matter of: Petition in accordance with the GERC (Conduct of Business) Regulations, 2004 for approval and necessary direction of the GERC with regards to the Procurement of Power for meeting the base load requirement by extension of existing PPA with M/s PTC India Limited for supply of power under medium Term Open Access […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Extension of Bid Submission Deadline & Amendment-2 for 50 MW Solar PV Project

Extension of Bid submission Deadline & Amendment 2: Tender for 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 50 MW (AC) Solar PV Project with […]

MSEDCL Issue Tender for Long Term bids for Procurement of 1.6 GW Coal Based Power Project and 5 GW Solar Project through Tariff based bidding process – EQ

Extension of Bid submission Deadline for 100 MW Solar PV Project at Rajnandgaon, Chhattisgarh

Extension of Bid submission Deadline: Selection of Consultancy Firm for Owners Engineer (OE) services for 100 MW (AC) Solar PV Project (160MWp DC capacity) along with 40MW/120 MWh Battery Energy Storage System at district Rajnandgaon, Chhattisgarh, India during Design, Construction, Commissioning and Operations of the facility under Innovations in Solar Power & Hybrid Technologies Project […]

MSEDCL Issue Tender for Long Term bids for Procurement of 1.6 GW Coal Based Power Project and 5 GW Solar Project through Tariff based bidding process – EQ

In the Matter of Extension of Period of Banking of Units Generated and Wheeled to the Distribution Companies

In the matter of Petition under Section 17 and 34 of the Gujarat Electricity Industry (Reorganisation and Regulations) Act, 2003 and in the matter of wind power policy, 2007 and Gujarat Wind Solar Hybrid Power Policy, 2018 and Section 86 (1), (c) , (e) & (f) of the Electricity Act, 2003 and read with GERC […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

Extension of bid submission deadline- XI for setting up of 15 MW Solar PV Power Plant at Himachal Pradesh

Extension of bid submission deadline- XI : Selection of Solar Power Developers for setting up of 15 MW Grid Connected Floating Solar PV Power Plant at Nangal Pond, Near Village Neilla, District Bilaspur, Himachal Pradesh This is in reference to the RfS No. SECI/C&P/SPD/RfS/15MW/BBMB/072020 regarding the Tender for “Selection of Project Developer for Setting up of 15 […]

MSEDCL Issue Tender for Long Term bids for Procurement of 1.6 GW Coal Based Power Project and 5 GW Solar Project through Tariff based bidding process – EQ

Seeking indulgence of the Commission and permission for extension of the period for completion of the Hero Solar Generation Switchyard

  Petition under Section 79(1)(f) along with Section 79(1)(k) of the Electricity Act, 2003 read with Regulations 32 and 33A of the Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access in inter-State Transmission and Related Matters) Regulations, 2009 seeking indulgence of the Commission and permission for extension of the period for completion of […]

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ

In the matter of; Extension of time limit for execution of PPAs for the projects covered in’ Small Scale Distributed Solar Projects, 2019’ policy of the Government of Gujarat.

In the matter of; Extension of time limit for execution of PPAs for the projects covered in’ Small Scale Distributed Solar Projects, 2019’ policy of the Government of Gujarat. For more information please see below link.

Petition for “Formulation of Regulations and Determination of Tariff for Green Energy Open Access Consumers” – EQ