1. Home
  2. Tag "EXTENSION"

Extension of Bid submission Deadline for 100 MW Solar PV Project at Rajnandgaon, Chhattisgarh

Extension of Bid submission Deadline: Selection of Consultancy Firm for Owners Engineer (OE) services for 100 MW (AC) Solar PV Project (160MWp DC capacity) along with 40MW/120 MWh Battery Energy Storage System at district Rajnandgaon, Chhattisgarh, India during Design, Construction, Commissioning and Operations of the facility under Innovations in Solar Power & Hybrid Technologies Project […]

SECI issue Tender for Selection of WPD for Setting up of 1.2 GW ISTS-connected Wind Power Projects (SECI-Tranche-XX) – EQ

In the Matter of Extension of Period of Banking of Units Generated and Wheeled to the Distribution Companies

In the matter of Petition under Section 17 and 34 of the Gujarat Electricity Industry (Reorganisation and Regulations) Act, 2003 and in the matter of wind power policy, 2007 and Gujarat Wind Solar Hybrid Power Policy, 2018 and Section 86 (1), (c) , (e) & (f) of the Electricity Act, 2003 and read with GERC […]

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

Extension of bid submission deadline- XI for setting up of 15 MW Solar PV Power Plant at Himachal Pradesh

Extension of bid submission deadline- XI : Selection of Solar Power Developers for setting up of 15 MW Grid Connected Floating Solar PV Power Plant at Nangal Pond, Near Village Neilla, District Bilaspur, Himachal Pradesh This is in reference to the RfS No. SECI/C&P/SPD/RfS/15MW/BBMB/072020 regarding the Tender for “Selection of Project Developer for Setting up of 15 […]

SECI issue Tender for Selection of WPD for Setting up of 1.2 GW ISTS-connected Wind Power Projects (SECI-Tranche-XX) – EQ

Seeking indulgence of the Commission and permission for extension of the period for completion of the Hero Solar Generation Switchyard

  Petition under Section 79(1)(f) along with Section 79(1)(k) of the Electricity Act, 2003 read with Regulations 32 and 33A of the Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access in inter-State Transmission and Related Matters) Regulations, 2009 seeking indulgence of the Commission and permission for extension of the period for completion of […]

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

In the matter of; Extension of time limit for execution of PPAs for the projects covered in’ Small Scale Distributed Solar Projects, 2019’ policy of the Government of Gujarat.

In the matter of; Extension of time limit for execution of PPAs for the projects covered in’ Small Scale Distributed Solar Projects, 2019’ policy of the Government of Gujarat. For more information please see below link.

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

Seeking extension of the application of the retail supply tariffs, cross subsidy surcharge and additional surcharge

Seeking extension of the application of the retail supply tariffs, cross subsidy surcharge and additional surcharge. For more information please see below link.

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

CPSU Kabankalan holds training on solar-powered water system

AS WATER is a vital element of life and an essential component for a healthy and productive community, initiatives are being undertaken by the Research and Extension Office of Central Philippines State University in Kabankalan City to let this basic need be enjoyed by the people concerned. Seeing this predicament being experienced by the households […]

Hydrogen subsidies | Australian solar-to-methanol project secures €24m grant — with half coming from Germany -EQ

BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs

  M/s. BTN Solar Private Limited/ To issue appropriate direction to the respondent complete construction / commissioning of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs TNERC refused to extend the commissioning deadline of 50 MW solar power project Conclusion:- We conclude by observing that only […]

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

NTPC CMD Gurdeep Singh’s term extended till July 2025

This extension makes him one of the longest serving chief at India’s largest power generation utility Singh’s extension comes in the backdrop of NTPC’s pivot towards green energy NEW DELHI : The Appointments Committee of the Cabinet (ACC) has extended the tenure of state run NTPC Ltd chairman and managing director, Gurdeep Singh till 31 […]

Local Sourcing Push May Trigger Solar Cell Shortage in India from June – EQ