Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited – EQ Mag April 1, 2023 Anand Gupta 000 Policy & Regulation Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited. For more information please see below link: Read more Petition of 200 MW firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ