Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited – EQ Mag
Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited.
For more information please see below link:


