Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required from the date of grant of final connectivity – EQ

Summary: — ##  Key Business Prayers by SUCRL | Prayer | Description | |——–|————-| | **Prayer (a)** | Allow land document submission within 12 months of final connectivity / coordinates, not 18 months from in-principle grant. | | **Prayer (b)** | Alternative: 18–24 months before scheduled start date (31 Dec 2029). | | **Prayer (c)** […]

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Summary: — ### Reliefs Sought by SUCRL (Main Petition & IAs) 1. Relax timeline for land document submission – allow **12 months from final grant** or **12 months from issuance of coordinates** (instead of 18 months from in‑principle grant). 2. Alternatively, permit land document submission **18‑24 months before start date (31.12.2029)**. 3. Transfer/reallocate connectivity to […]

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ