Petition for Determination of Generic Levellised Tariffs for Small Hydro Projects above 100 kW for 4th Control Period (i.e. 01.10.2023 to 31.03.2027) – EQ November 20, 2023 Anand Gupta 00 Policy & Regulation Petition for Determination of Generic Levellised Tariffs for Small Hydro Projects above 100 kW for 4th Control Period (i.e. 01.10.2023 to 31.03.2027) For more information please see below link: Read more Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ