Filing of Petition for True Up of FY 2020-21, Aggregate Revenue Requirement for FY 2022 and Determination of SLDC Fees & Charges for FY 2022-23. For more information please see below link:
Gujarat Floats Tender for 112 MW of Solar Projects in Gujarat Tender No. No. GSECL/ PP/ RE & BD/ 112 MW Solar PV/ Dtd 06.04.21,“Design, Engineering, Supply & Procurement, Construction, Operation And Maintenance Of 112MW Solar Photovoltaic Grid Connected Power Plant Ranging From 10 To 50 MW At Various Substations Of GETCO In The State […]
Gujarat Floats Tender for 140 MW of Solar Projects at Various substations of GETCoin The Chief Engineer (P&P), Gujarat State Electricity Corporation Limited, invites Tender For “ Design, Enginnering, supply & procurement, construction, opewration & maint. Of 140MW Solar PV Grid connected Power plant ranging from 10-40MW at Various substations of GETCoin the state […]
The last date for submission of bids is October 20, 2020 Tender No. GSECL/ PP/ RE/ Khavda/RE PARK/3325 MW,The Chief Engineer (P&P), Gujarat State Electricity Corporation Limited, Invites Tender For “Advisory Services For Conceptualization & Preparation Of Feasibility Cum Detailed Project Report (DPR) Along With Work Of Soil Investigation, Geotechnical Survey, Topography Survey, Contour Survey, […]
Tender No. GSECL/ PP/ RE/ 210MW Solar PV ,“Bid For Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning And Operation And Maintenance Of 210 MW Grid Connected Solar PV Power Project At Babarzar, District Jamnagar, Gujarat”.GSECL CORP.OFFICE,P&P DEPT. For more information please see below link:
Tender No. GSECL/PP/RE&BD/110MW Solar PV/ Tender ID. -422237,Tender For “Inviting Bid For Design, Engineering, Supply & Procurement, Construction, Operation And Maintenance Of 110 MW Solar Photovoltaic Grid- Connected Ranging From 10 To 55 MW At Various Substations Of GETCO In The State Of Gujarat”GSECL CORP.OFFICE,P&P DEPT. For more information please see below link:
Aditya Birla Group is an Indian multinational conglomerate, headquartered in Worli, Mumbai, Maharashtra. With over seven decades of responsible business practices, our businesses have grown into global powerhouses in a wide range of sectors – metals, pulp and fibre, chemicals, textiles, carbon black, telecom and cement and renewables energy. In renewable energy development, Aditya […]
In the matter of: Petition under Section 86(1)(f) of the Electricity Act, 2003 qua disputes over GETCO’S failure to comply inter alia with the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, and GETCO’s arbitrary and wrongful refusal to rectify its present metering arrangement for the Petitioner’s power plant and change the placement […]
Tender For “Inviting Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 185 MW Solar Photovoltaic Grid-Connected Power Plant Ranging From 20-40 MW at Various Substations of GETCO in The State of Gujarat” For more information please see below link: