Draft MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 – EQ May 23, 2024 Anand Gupta 00 Policy & Regulation Draft MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 For more information please see below link: Read more Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ