Petition of the GERC (Conduct of Business) Regulations for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power to Intra-State Transmission System – EQ

Summary: — ## **Case Summary – OPWIND Energy Pvt. Ltd. vs. GETCO** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2472 of 2025 **Order Date:** 19 July 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** M/s. OPWIND Energy Pvt. Ltd. * Counsel: Adv. Vineet […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of the Procedure for ‘Grant of Connectivity to projects based on Renewable Sources to Intra-State Transmission System’ approved to restore the Stage-II Connectivity granted to Enfinity Global Surya Vayu Energy Pvt. Ltd. – EQ

Petition of the Procedure for ‘Grant of Connectivity to projects based on Renewable Sources to Intra-State Transmission System’ approved to restore the Stage-II Connectivity granted to Enfinity Global Surya Vayu Energy Pvt. Ltd. For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Cabinet approves Intra-State Transmission System – Green Energy Corridor Phase-II – EQ Mag Pro

The scheme is targeted to be set up with total estimated cost of Rs. 12,031 crore The scheme will help in achieving the target of 450 GW installed RE capacity by 2030 The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, Shri Narendra Modi, today approved the scheme on Green Energy Corridor (GEC) […]

India Plans to Scale Up Critical Mineral Exploration, Strengthen Domestic Value Chains – EQ

Inviting comments/suggestions of Stakeholders on Consultation Paper on Development of Intra-State Transmission System through Tariff Based Competitive Bidding – EQ Mag Pro

Inviting comments/suggestions of Stakeholders on Consultation Paper on Development of Intra-State Transmission System through Tariff Based Competitive Bidding. For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Public Hearing on the Draft Connection Agreement for the use of Intra State Transmission System of KPTCL in the State of Karnataka – EQ Mag Pro

Public Hearing on the Draft Connection Agreement for the use of Intra State Transmission System of KPTCL in the State of Karnataka. For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ