Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25 October 11, 2022 Anand Gupta 000 Policy & Regulation Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25 For more information please see below link: Read more Petition for the determination of transmission tariff for “Strengthening of OPGW network within the Eastern Region Grid and Connectivity with other regions” in the Eastern Region – EQ