Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25
Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25
For more information please see below link:




