Summary: — ### **Project Specifics** – **Location:** Navinal (Mundra), Gujarat – **Purpose:** Transmission system for providing **connectivity to Renewable Energy (RE) applicants** at Navinal (Mundra) GIS (Gas Insulated Substation) – **Route:** **Regulated Tariff Mechanism (RTM)** – meaning the transmission asset will earn a regulated return on equity and cost-plus tariff, as opposed to competitive bidding […]
Summary: —- **1. Overview of the Petition** – **Petition No:** 1029/TL/2025 – **Subject:** Application for the grant of a separate transmission license. – **Petitioner:** Navinal Transmission Limited (NNTL). – **Purpose:** To obtain a transmission license for a system at Navinal (Mundra) (GIS) under the Regulated Tariff Mechanism (RTM) route. This system is intended to provide […]