1. Home
  2. Tag "NIT FOR SUPPLY"

NIT For Supply, installation, testing and commissioning of solar system to cater load of 160 W per house for 125 houses at NKSTPP project affected villages Raham and Tandwa in block Tandwa, Dist-Chatra

NIT For Supply, installation, testing and commissioning of solar system to cater load of 160 W per house for 125 houses at NKSTPP project affected villages Raham and Tandwa in block Tandwa, Dist-Chatra For more information please see below link:

Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation For 5 Years Total 1280 kW Connected Solar PV Power Plant Nagpur In The State Of Maharashtra.

NIT FOR SUPPLY, ERECTION, TESTING and COMMISSIONING OF 1200KWP GRID CONNECTED SOLAR PV PROJECT ON ROOFTOP OF BUILDINGS OF NTPC – GADARWARA

NIT FOR SUPPLY, ERECTION, TESTING and COMMISSIONING OF 1200KWP GRID CONNECTED SOLAR PV PROJECT ON ROOFTOP OF BUILDINGS OF NTPC – GADARWARA For more information please see below link:

Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation For 5 Years Total 1280 kW Connected Solar PV Power Plant Nagpur In The State Of Maharashtra.

NIT for Supply, Installation and Commissioning of 300 KWp Roof Top Solar PVplant in different locations in PTS, TSTPS, Kaniha

NIT for Supply, Installation and Commissioning of 300 KWp Roof Top Solar PVplant in different locations in PTS, TSTPS, Kaniha For more information please see below link:

Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation For 5 Years Total 1280 kW Connected Solar PV Power Plant Nagpur In The State Of Maharashtra.

NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 1MWp GRID CONNECTED FLOATING SOLAR PV SYSTEM AT NTPC KAWAS RESERVOIR, ADITYANAGAR, SURAT, GUJARAT

NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 1MWp GRID CONNECTED FLOATING SOLAR PV SYSTEM AT NTPC KAWAS RESERVOIR, ADITYANAGAR, SURAT, GUJARAT For more information please see below link:

Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation For 5 Years Total 1280 kW Connected Solar PV Power Plant Nagpur In The State Of Maharashtra.