1. Home
  2. Tag "Piecewise Solution"

Solis Seminar 55 – Using the piecewise method to check the PV string ground point – EQ Mag

Background As the running time of PV plants increase, the DC line slowly ages, and the waterproof performance of the DC terminal (MC4 terminal) deteriorates. As a result, the insulation impedance of the DC line is too low, or the positive and negative terminals are short circuited to the ground. Either way, major failures may […]

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ