1. Home
  2. Tag "PM-KUSUM"

PEDA awards 264 MW solar projects under PM-KUSUM – EQ

In Short : The Punjab Energy Development Agency (PEDA) has awarded 264 MW of solar projects under the PM-KUSUM scheme. This initiative aims to help farmers by providing solar power for irrigation, reducing reliance on grid electricity. The projects support India’s renewable energy goals, enhance rural energy access, and contribute to the country’s commitment to […]

Local Sourcing Push May Trigger Solar Cell Shortage in India from June – EQ

Clarification regarding Component ‘C’ (FLS) of Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabihiyaan (PM KUSUM) – EQ

Clarification regarding Component ‘C’ (FLS) of Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabihiyaan (PM KUSUM) For more information please see below link:

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ

Nearly 21 lakh farmers have benefitted from PM-KUSUM: Union Power & NRE Minister Shri R. K. Singh – EQ Mag

PM-KUSUM Scheme consists of following three components: Component-A: installation of aggregated 10,000 MW capacity of small solar power plants, each of capacity up to 2 MW on the barren/fallow/pasture/marshy/ cultivable land of farmers. Component-B: installation of 20 lakh standalone solar water pumps; and Component-C: solarization of 15 lakh existing grid-connected agriculture pumps including through feeder […]

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ

Petition seeking approval for adoption of tariff discovered for long term procurement of 8.7 MW solar power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (PM-KUSUM) – EQ Mag

Petition seeking approval for adoption of tariff discovered for long term procurement of 8.7 MW solar power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (PM-KUSUM). For more information please see below link:

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

PM-KUSUM – Grid-connected solar power plants of 89.45 MW capacity installed; 2.09 lakh agriculture pumps have been solarized – EQ Mag

The Ministry of New and Renewable Energy has taken several steps to achieve the targets under the PM-KUSUM Scheme. This includes amendment in the Scheme guidelines based on feedback received during implementation. Details of the major amendments made in the scheme are given at Annexure-I. State/ UT-wise details of the beneficiaries under the PM-KUSUM Scheme […]

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ

PM-KUSUM – 89.45 MW capacity has been installed under Component-A and around 2.09 lakh pumps have been reported solarized under Component-B and Component-C – Union Power & NRE Minister Shri R.K. Singh – EQ Mag

Under PM-KUSUM Scheme, for allocation of capacities, demands are solicited from the States/ UTs. Based on demands received and progress reported by States/ UTs, allocations are made under the Scheme. State/ UT-wise demand, including the State of Odisha, received for the period till 31.03.2026, are given at Annexure-I. Under Component-A of the Scheme, power is […]

Local Sourcing Push May Trigger Solar Cell Shortage in India from June – EQ

MPUVNL Issue Tender for Setting up of Grid connected Solar PV based Power Plants (SPP) under feeder solarization component of PM KUSUM – EQ Mag

    Tender Documents Date and Time of Start of Procurement of Tender Documents 16-Jan-2023 23:55:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure of Procurement of Tender Documents 07-Feb-2023 18:00:00 RTZ Corresponding Local Date and Time Not Applicable Cost of Tender Documents Free of Cost Procurement of Tender Documents Online […]

SECI issue Tender for Selection of WPD for Setting up of 1.2 GW ISTS-connected Wind Power Projects (SECI-Tranche-XX) – EQ

Objectives of PM-KUSUM – EQ Mag Pro

Provisions of PM-KUSUM Scheme to increase country’s solar water pump manufacturing capacity ​​​​​​​Steps by Government of India for decentralized solar power production The objectives of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) include de-dieselisation of the farm sector, providing water and energy security to farmers, increasing the income of farmers and curbing […]

Local Sourcing Push May Trigger Solar Cell Shortage in India from June – EQ

States are progressing under PM-KUSUM #Scheme and are at different stages of implementation for the three components – EQ Mag Pro

The States are progressing under PM-KUSUM #Scheme and are at different stages of implementation for the three components.

Extension of Inter-State Transmission charges waiver on transmission of the electricity generated from solar and wind sources of energy, for the RE projects delayed due to delay in readiness of transmission infrastructure -reg. – EQ

Petition seeking approval for adoption of tariff discovered for long term procurement of 31.75 MW solar power under PM-KUSUM – EQ Mag Pro

Petition seeking approval for adoption of tariff discovered for long term procurement of 31.75 MW solar power under PM-KUSUM. For more information please see below link:

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ