1. Home
  2. Tag "POWER EVACUATION"

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System for Power evacuation from ARUN-3 HEP, Nepal of M/s SAPDC – Indian Portion” in the Eastern Region – EQ

Summary: — **1. Project & Asset Details** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL). – **Project:** Transmission System for Power Evacuation from **ARUN-3 (900 MW) HEP, Nepal** (developed by M/s SJVN Arun-3 Power Development Company Pvt. Ltd. – SAPDC). – **Asset in Question (Asset-1):** – **Sitamarhi (POWERGRID) – Dhalkebar (NEPAL) 400 kV D/C […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

NHPC Ltd issue Tender for Development of Power Evacuation Infrastructure for 1200 MW Jalaun Solar Park – EQ

Summary: — ## 1. PROJECT OVERVIEW | **Item** | **Details** | |———|————| | **Name of Work** | Development of Power Evacuation Infrastructure for 1200MW Jalaun Solar Park | | **Scope** | 400kV/33kV PSS-1 & PSS-2 (Part A & B), internal & external 400kV transmission lines, EHV/HV equipment, pooling systems, Park Control & Monitoring, all electrical, […]

NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ

INKEL Issue Corrigendum for SELECTION OF PROJECT MANAGEMENT CONSULTANT FOR POWER EVACUATION WORKS FOR SOLAR AND WIND HYRID PARK AT PALAKKAD KERALA – EQ

INKEL Issue Corrigendum for SELECTION OF PROJECT MANAGEMENT CONSULTANT FOR POWER EVACUATION WORKS FOR SOLAR AND WIND HYRID PARK AT PALAKKAD KERALA  For more information please see below link:

NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ