Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP – EQ July 25, 2025 Anand Gupta 000 Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP For more information please see below link: Read more Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for RSPPL and Ors. – EQ