1. Home
  2. Tag "PRE-BID MEETING NOTIFICATION : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM"

PRE-BID MEETING NOTIFICATION : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […]

GAIL Ltd issue Tender for Design and SITC of On-Grid Rooftop Solar Power Works with Net-Metering System at SV2B, SV5B, IP4, IP5 AND IP7 STATIONS AT GAIL DBPL – EQ

PRE-BID MEETING NOTIFICATION : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […]

Rising Cleantech Startups Driving India’s Transition to a Greener Future – EQ