1. Home
  2. Tag "RE power projects"

SECI Issue Tender for supply of 1.25 GW Firm and Dispatchable Power from ISTS-Connected RE Power Projects in India (SECI-FDRE-IV) – EQ Mag

SECI hereby intimates its intent for procurement of Firm and Dispatchable power from RE Projects for an aggregate capacity of 1250 MW. The Projects will be set up on “Build Own Operate” (B-O-O) basis. SECI shall enter into a Power Purchase Agreement (PPA) with the successful Bidder(s) selected based on this RfS for the purchase […]

Ministry of Railways issue Tender for Provision of On Grid Solar system at different buildings in PRRB-ARJ-POKL &amp ARJ-GCT section – EQ

NIT for supply of 500 MW Firm and Dispatchable Power from ISTS-Connected RE Power Projects in India (FDRE-I) – EQ Mag

SECI hereby intimates its intent for procurement of Firm and Dispatchable power from RE Projects for an aggregate capacity of 500 MW. The Projects will be set up on “Build Own Operate” (B-O-O) basis. SECI shall enter into a Power Purchase Agreement (PPA) with the successful Bidder(s) selected based on this RfS for the purchase […]

Ministry of Railways issue Tender for Provision of On Grid Solar system at different buildings in PRRB-ARJ-POKL &amp ARJ-GCT section – EQ

Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected RE Power Projects – EQ Mag

Amendment to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected RE Power Projects. For more information please see below link:

Redefining Geoscience- 64th Central Geological Programming Board Meeting to be held in Bhubaneswar on 19th January 2025 – EQ

Determination of tariff / Indicative tariff for the RE power projects, as per the eligibility criteria specified in HERC RE Regulations – EQ Mag Pro

Determination of tariff / Indicative tariff for the RE power projects, as per the eligibility criteria specified in HERC RE Regulations. For more information please see below link:

Petition of the GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations – EQ