Petition for Adoption of tariff of Firm & Dispatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ

Summary: — 1. **Background & Procedural Update:** The Petitioner (NHPC) informed the Commission that notices were issued to all Respondents on February 26, 2026, allowing them to file replies. However, **none of the Respondents filed any reply.** 2. **Respondent’s Position:** The counsel for Respondent *ACME Solar Holdings Limited* explicitly **supported the Petition**. They confirmed that […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the Electricity Act of 200 MW firm and dispatchable renewable energy with Greenshoe option from Grid Connected RE Power Projects with ESS – EQ

Summary: —- ## Key Details at a Glance | Parameter | Details | |———–|———| | **Petition No.** | 10/2026 | | **Petitioner** | Tata Power Delhi Distribution Ltd. (TPDDL) | | **Project Type** | Firm and Dispatchable Renewable Energy (FDRE) with Energy Storage System (ESS) | | **Base Capacity** | 200 MW | | **Greenshoe […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Tariff for Supply of 6000 MWh Assured Peak Power from ISTS-connected RE Power Projects with ESS anywhere in India – EQ

Summary: —- **Project Overview:** – **Project:** Supply of 6,000 MWh of assured peak power (equivalent to 1500 MW for 4 hours). – **Type:** ISTS-connected Renewable Energy (RE) power projects with Energy Storage Systems (ESS). – **Location:** Anywhere in India. – **Tariff Discovery:** Tariff was determined through a transparent Competitive Bidding Process, and the petitioner seeks […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption for Despatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects with ESS by Ministry of Power – EQ

Summary: —- **1. Case Overview** This document is a Record of Proceedings (RoP) from the Central Electricity Regulatory Commission (CERC) regarding a petition filed by NHPC Limited. NHPC is seeking the Commission’s adoption of tariff for an additional 1150 MW of Firm & Despatchable renewable power. This capacity was procured under the “Greenshoe Option” from […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for the Adoption of tariff for 2100 MW Firm & Despatchable Power from ISTS connected RE Power Projects by Govt. of India – EQ

Summary: — ### Key Business, Legal & Regulatory Points **1. Parties & Subject Matter** – **Petitioner:** NHPC Limited (designated as an Intermediary Procurer/REIA by MNRE). – **Respondents:** Five successful Renewable Energy Power Generators (REPGs), including Avaada Energy, Essar Renewables, and Serentica Renewables. – **Subject:** Petition under Section 63 of the Electricity Act, 2003, seeking adoption […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Supply of 6000 MWh Assured Peak Power from ISTS- connected RE Power Projects with ESS anywhere in India – EQ

Summary: —- **1. Case Overview** – **Regulatory Body:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petition Number:** 31/AT/2026. – **Subject:** Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff discovered through competitive bidding for supply of assured peak power from renewable energy projects with energy storage. – **Petitioner:** SJVN Limited […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for the Adoption of tariff for 420 MW RTC power from ISTS-connected RE Power Projects (SECIRTC- IV) by the Ministry of Power, Government of India – EQ

Summary: — ## **1. Purpose of the Petition** SECI filed the petition under **Section 63 of the Electricity Act, 2003** seeking CERC’s approval for: 1. Adoption of tariff discovered through competitive bidding for **420 MW RTC renewable power** under SECI-RTC-IV. 2. Approval of **₹0.07/kWh trading margin**. This procurement is under the **MoP Guidelines dated 9 […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for the Adoption of tariff for 420 MW RTC power from ISTS-connected RE Power Projects (SECIRTC- IV) by the Ministry of Power, Government of India -EQ

Summary: — ## **1. Parties Involved** * **Petitioner:** Solar Energy Corporation of India Ltd. (SECI) * **Respondents:** 1. Hero Solar Energy Pvt. Ltd. 2. Hexa Climate Solutions Pvt. Ltd. 3. Sembcorp Green Infra Pvt. Ltd. 4. Jindal India Power Ltd. — ## **2. Purpose of Petition** SECI petitioned under **Section 63 of the Electricity Act, […]

How governments can best support consumers during this energy crisis – EQ

Petition for Adoption of tariff for 420 MW RTC power from ISTS- connected RE Power Projects (SECI-RTC-IV) by the Ministry of Power, Government of India – EQ

Summary: — ### **1. Background** The **Solar Energy Corporation of India Limited (SECI)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003**, seeking **adoption of tariff** for **420 MW Round-The-Clock (RTC) renewable power** from **Inter-State Transmission System (ISTS)-connected projects**. The tariff was discovered through a **competitive […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ