Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Summary: — ### 1. Background and Context – **Petitioner:** Solar Energy Corporation of India (SECI). – **Prayer:** Adoption of usage charges of **₹2.57/kWh** with **VGF of ₹44,72,000 per MW** for a 1200 MW solar PV project, discovered through competitive bidding. – **Governing Framework:** – **CPSU Scheme Phase-II** (MNRE, March 5, 2019) for setting up 12,000 […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for RTM Transmission License to POWERGRID Bikaner Neemrana Transmission Limited -EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for RTM Transmission License to POWERGRID Bikaner Neemrana Transmission Limited For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ