1. Home
  2. Tag "RERC"

Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations – EQ

Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for seeking approval of deviations, along with justifications in the Model Bidding Document for procurement of 160 MW RTC power – EQ Mag

Petition for seeking approval of deviations, along with justifications in the Model Bidding Document for procurement of 160 MW RTC power. For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2020-21 to FY 2023-24 for Suratgarh Super Critical Thermal Power Plant – EQ Mag

Determination of Final Capital Cost and Aggregate Revenue Requirement (ARR) and Tariff for FY 2020-21 to FY 2023-24 for Suratgarh Super Critical Thermal Power Plant. For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations – EQ Mag

Draft Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) (3rd Amendment) Regulations For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition filed by Rajasthan Discoms in the matter of approval of Power Purchase from short term sources for Rajasthan Discoms – EQ Mag

Petition filed by Rajasthan Discoms in the matter of approval of Power Purchase from short term sources for Rajasthan Discoms. For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Truing up of ARR of FY 2021-22 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 – EQ Mag

In the matter of Truing up of ARR of FY 2021-22 for KTPS (Units 1-7), STPS (Units 1-6),CTPP (Units 1-4), KaTPP (Units 1-2), CSCTPP (Units 5&6), RGTPS (270.50 MW), Mahi Hydel and approval of Aggregate Revenue Requirement (ARR) & Tariff for FY 2023-24 for KTPS (Units 1-7), STPS (Units 1-6), CTPP (Units 1-4), KaTPP (Units […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Energy regulator proposes new rules to push renewable projects – EQ Mag

Jaipur : The Rajasthan Electricity Regulatory Commission (RERC) has proposed amendments in rules to simplify the development of renewable power projects. RERC has proposed three new regulations to align with the Green Energy Open Access Rules, 2022. These regulations include the Green Energy Tariff, Green Certificate, and Ratings. For this, RERC has issued the draft […]

Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah – EQ

Rooftop solar power to fetch more money – EQ Mag

Jaipur: After continuing opposition, Rajasthan Electricity Regulatory Commission (RERC) has circulated a draft proposal to increase the rates for excess power that rooftop projects inject to the grid. Currently, the discoms are paying Rs 2.14 paise a unit for excess rooftop power. In the draft, RERC proposed to increase it to the level of the […]

Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah – EQ