1. Home
  2. Tag "rooftop solar plants"

NHPC issue Tender for SoD for installing rooftop solar plants on buildings of various departments-Law and Parliamentary Affairs in UT of JnK through JAKEDA RESCO mode – EQ

Summary: — ### Qualification Requirements (Summary) | Parameter | Requirement | |———–|————-| | **Net Worth** | ₹9,900 per KW or above | | **Annual Turnover** (OR) | ₹4,950 per KW or above | | **PBDIT** (OR) | ₹990 per KW or above | | **Line of Credit** (OR) | ₹1,238 per KW or above (sanction […]

Himachal Pradesh issue Tender for 9 MW Solar Project with 6.3 MWh Battery Storage – EQ

MES issue Tender for Provn of Rooftop Solar Plants at Certain Buildings under GE Deolali – EQ

Summary: — ## 📘 Tender Overview * **Project**: Provision of **Rooftop Solar Plants (820 kW)** at buildings under **GE Deolali**. * **Estimated Cost**: ₹ 3.50 crore (approx.) * **Completion Time**: 4 months from site hand-over * **Contract Type**: Item-rate, based on MES Form IAFW-1779-A with BOQ and GCC IAFW-2249 * **Tender Portal**: [https://www.defproc.gov.in](https://www.defproc.gov.in) * **Tender […]

Himachal Pradesh issue Tender for 9 MW Solar Project with 6.3 MWh Battery Storage – EQ

MES issue Tender for Provn of Rooftop Solar Plants at Certain Buildings under GE (N) Ahilyanagar – EQ

Summary: — ## 📘 Tender Overview * **Project**: Installation of **600 kW rooftop solar power plants** under **GE (North) Ahilyanagar**. * **Estimated Cost**: ₹2.70 crore * **Completion Time**: 4 months from site handover * **Tender Type**: Item-rate contract (IAFW-1779-A with BOQ) * **Portal**: [https://www.defproc.gov.in](https://www.defproc.gov.in) — ## 💰 Fees & Deposits * **Tender Fee**: ₹2,000 (DD […]

Himachal Pradesh issue Tender for 9 MW Solar Project with 6.3 MWh Battery Storage – EQ

Rooftop solar plants constructed in 12,500 households in Tripura so far: Power Min – EQ

In Short : The Power Ministry announced that 12,500 households in Tripura have installed rooftop solar plants so far, promoting clean energy adoption in the state. The initiative aims to reduce dependency on conventional power sources, lower electricity costs for residents, and support India’s renewable energy targets. The project also contributes to sustainable development and […]

Andhra Pradesh Approves ₹2,500 Crore Cathode Plant in Chittoor to Strengthen EV Battery Ecosystem – EQ