1. Home
  2. Tag "SOLAR POWER SYSTEM"

BPCL issue Tender for DSITC of Solar Power System at BPCL Sewree Premises, Mumbai – EQ

BPCL issue Tender for DSITC of Solar Power System at BPCL Sewree Premises, Mumbai For more information please see below link: Tender Details : Tender Title : DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF SOLAR POWER SYSTEM AT BPCL SEWREE PREMISES, MUMBAI Tender Reference Number : 1000431627 Tender Type : Open/Advertised Tender Category : Works […]

MES issue Tender for Provision of Roof Top Solar Plants Totalling 150 KW and 100 KW at Certain Buildings under GE Satwari and 15 KW under GE Kaluchak – EQ

CPWD issue Tender for SITC of Ongrid Roof Top Solar Power System – EQ

CPWD issue Tender for SITC of Ongrid Roof Top Solar Power System For more information please see below link: Tender Details : Tender Title : 184/EE(E)/LKO/2024-25 Tender Reference Number : 184/EE(E)/LKO/2024-25 Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product Sub-Category : Tender Fee * : 0 EMD * : 133722 Location […]

MES issue Tender for Provision of Roof Top Solar Plants Totalling 150 KW and 100 KW at Certain Buildings under GE Satwari and 15 KW under GE Kaluchak – EQ

Individual household solar power system – EQ Mag

The Ministry of New and Renewable Energy (MNRE) is implementing Rooftop Solar Programme Phase II to promote rooftop solar (RTS) in the country providing financial support to individual households for installation of RTS. The Programme is demand driven and RTS capacity aggregating 4000 MW is targeted for residential sector through provision of total Central Financial […]

MNRE Secretary Reviews IREDA Performance and Strategic Initiatives – EQ

Inverter Starts up Late? Find Possible Causes and Troubleshoot Problem – EQ Mag

Background The amount of power generated by a solar power system is positively correlated with the grid-connected working time of the system. Under the same conditions, the earlier the inverter starts up and connects to the grid, the higher the power generation. For example, in the same summer, one inverter can usually start up and […]

MNRE Secretary Reviews IREDA Performance and Strategic Initiatives – EQ