1. Home
  2. Tag "Solar PV power station"

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll – EQ

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll For more information please see below link:

Draft KERC (Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge) Regulations, 2025 – EQ

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector – EQ

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector For more information please see below link:

Draft KERC (Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge) Regulations, 2025 – EQ

Application for Purchase Agreement (PPA) executed between GRIDCO Ltd. and M/s. ACME Odisha Solar Power Pvt. Ltd. for procurement of 25MW power from the Solar PV power station in Bolangir – EQ Mag

Application for Purchase Agreement (PPA) executed between GRIDCO Ltd. and M/s. ACME Odisha Solar Power Pvt. Ltd. for procurement of 25MW power from the Solar PV power station in Bolangir. For more information please see below link:

Draft KERC (Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge) Regulations, 2025 – EQ