Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll – EQ
Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-Ill) Connected to the ISTS/STU under Central Power Sector undertaking Scheme Phase-ll
For more information please see below link:
tags:
1200 MW ADOPTION Central Power Sector CERC ISTS/STU REGULATIONS Scheme Phase-ll Solar PV power station Tranche-Ill Connected


