1. Home
  2. Tag "System Strengthening XIX scheme"

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of transmission tariff for “Combined Asset under System Strengthening XIX scheme” in the Southern Region – EQ

Summary: — #### **1. Subject of the Petition** – **Petitioner:** Power Grid Corporation of India Limited (PGCL). – **Asset:** Combined Asset under **”System Strengthening XIX Scheme”** in the **Southern Region**, comprising: 1. **LILO of existing Kolar–Sriperumbudur 400 kV line at Thiruvalam.** 2. **Kurnool–Thiruvalam 765 kV D/C line** (charged at 400 kV). 3. **Upgradation of Thiruvalam […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ