1. Home
  2. Tag "tariff"

Application seeking suitable directions of the HERC with PPA executed by the petitioner and the respondent

  Application seeking suitable directions under Regulation 66 & 68 of the HERC ( Terms and Conditions for determination of Tariff for Renewable Energy Sources, Renewable Purchase Obligations and Renewable Energy Certificate) Regulations read with PPA executed on 25.10.2012 by the petitioner and the respondent. For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of HERC for determination of Tariff of 50 MW Power Project 

  In the Matter of: Petition under section 62 of the Electricity Act, 2003 read with Regulation 6 (1) of the Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017 for determination of Tariff of 50 MW Power Project of […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

MSEDCL gets approval for Purchase of Power from new Bagasse based Co-Generation Projects through MOU Route

  Case of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for Purchase of Power from new Bagasse based Co-Generation Projects through Memorandum of Understanding Route 1. The Case No. 2 of 2021 is partly allowed. 2. Maharashtra State Electricity Distribution Co. Ltd. is allowed to enter into EPA/PPA through MoU with the new bagasse-based […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

In the matter of Determination of Generic Levellised Tariffs for Solar PV Projects for FY 2020-21

  Before Hon’ble HPERC in the matter of Determination of Generic Levellised Tariffs for Solar PV Projects for FY 2020-21 Determination of Generic Levellised Tariffs for Solar PV Projects for FY 2020-21 under Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2017 […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Madhya Pradesh Floats Tender For 40 MW capacity for Solar PV Power Projects

  NIT for Determination of tariff and selection of Solar Power Developer for Installation of Solar Project under Resco Model Online Request for Proposal (RfP) for ‘Tender cum Reverse Auction’ for Discovery of Tariff & Selection of Solar Power Developers for Design, Engineering, Supply, Financing, Installation, Testing and Commissioning along with Comprehensive Operation & Maintenance […]

NTPC Ltd issue Tender for SEC of 33KV M plus type lattice towers for 25 MW floating solar supply NTPC Simhadri – EQ

In the Matter of: Petition for determination of Pre-fixed levelized tariff for purchase of power by Discoms from decentralized Solar Power Plants

In the Matter of: Petition for determination of Pre-fixed levelized tariff for purchase of power by Discoms from decentralized Solar Power Plants and other Renewable Energy Generation Plants having capacity of 500 kW to 2 MW to be set up by Individual Farmers/Group of Farmers/Cooperatives/ Panchayats/Farmer Producer Organizations (FPO)/Water User Associations (WUA) in the vicinity […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Consultation Paper on the Proposed Norms for Determining Generic Tariff for Electricity

Consultation Paper on the Proposed Norms for Determining Generic Tariff for Electricity Generated from Mini-Hydel, Bagasse based Co-generation and Biomass based power plants to be commissioned during the control period 01.04.2021 to 31.03.2024 For more information please see below link:  

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

In the matter of Suo-Moto determination of pre-fixed levelised tariff under Component-A of PM-KUSUM Scheme

    In the matter of Suo-Moto determination of pre-fixed levelised tariff under Component-A of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme For more information please see below link:  

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ