In the matter of the CERC (Conduct of Business) and (Terms and Condition of Tariff) for truing up and determination of transmission tariff for Baharampur (POWERGRID) – Bheramara (BANGLADESH) in the Eastern Region – EQ

Summary: — ### Detailed Analysis of the CERC Order #### 1. Background and Project Overview – **Petitioner:** Power Grid Corporation of India Limited (PGCIL), the Central Transmission Utility. – **Respondent:** Bangladesh Power Development Board (BPDB), the sole beneficiary of the transmission asset. – **Asset in Question:** 400kV D/C (02nd) Baharampur (POWERGRID) – Bheramara (BANGLADESH) transmission […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

In the matter of CERC (Conduct of Business) and (Terms and Condition of Tariff) Regulations for determination of providing Connectivity to M/s Greenko AP01 IREP Pvt. Ltd. in the Southern Region – EQ

Summary: — ## 1. Case Overview | Parameter | Details | |———–|———| | **Petition Number** | 426/TT/2025 | | **Order Date** | January 19, 2026 | | **Petitioner** | Power Grid Corporation of India Limited (PGCIL) | | **Respondents** | 14 Distribution Companies across Southern Region + Greenko AP01 IREP Pvt. Ltd. + CTUIL | […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition of the CERC (Conduct of Business) and (Terms and Condition of Tariff) Regulations for determination and Installation of OPGW on existing Koldam – Ludhiana (PG) – EQ

Summary: — ### **Subject of the Petition** PKTCL has filed a petition seeking determination of the **transmission tariff** for the period from the **Commercial Operation Date (COD)** to **31 March 2029** for the following project: > **Project**: Supply and Installation of OPGW (Optical Ground Wire) on the existing 400 kV Koldam–Ludhiana (PG) line, which is […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition of the CERC (Conduct of Business), (Indian Electricity Grid Code) and (Terms and Condition of Tariff Regulations) for the Transmission System of Kallam Transmission Limited in the Western Region – EQ

Summary: —- **1. Document Nature & Core Issue:** * This is a **regulatory proceeding record** from the **Central Electricity Regulatory Commission (CERC)**. * **Petition No.:** 844/TT/2025. * **Core Business Issue:** Determination of the **transmission tariff** for a specific electricity transmission asset under the **Regulated Tariff Mechanism (RTM)**. * **Petitioner:** Kallam Transmission Limited (KTL). * **Asset:** […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition of the CERC (Terms and Condition for Renewable Energy Certificates for Renewable Energy Generation) Regulations to self – consumption of electricity at its co–generation facilities – EQ

Summary: — ### **Subject of Petition** Petition under **Regulation 17** of the **CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022** — seeking **regulatory directions to NLDC** to allow **trading of Renewable Energy Certificates (RECs)** issued to the Petitioner for **self-consumption** of electricity at its **co-generation facilities**. — ### **Background** […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition of the CERC (Conduct of Business) and (Terms and Condition of Tariff) Regulations under “Eastern Region Strengthening Scheme-VII (ERSS-VII)” in the Eastern Region – EQ

Summary: The petitions are as follows: * **Petition No. 474/TT/2024:** For transmission assets under the “Eastern Region Strengthening Scheme-VII (ERSS-VII)”[cite: 686]. The respondents are Bihar State Power (Holding) Company Limited and others[cite: 690]. * **Petition No. 16/TT/2025:** For transmission assets under the “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part A1″[cite: […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition with CERC (Terms and Condition of Tariff) Regulations for Phase-II Generation Projects in Odisha” in the Eastern Region – EQ

Summary: — ## **Case Summary – PGCIL Tariff Petitions (Odisha Phase-II & Barh Systems)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Date of Hearing:** 26 August 2025 **Coram:** * Shri Jishnu Barua, Chairperson * Shri Ramesh Babu V., Member * Shri Harish Dudani, Member * Shri Ravinder Singh Dhillon, Member — ### **1. Petitions […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition of the CERC (Conduct of Business) and (Terms and Condition of Tariff) Regulations for “POWERGRID work associated with common transmission system for Phase-II Generation Projects in Odisha” in the Eastern Region – EQ

Summary: — ## 📌 Case Overview * **Petitioner:** Power Grid Corporation of India Ltd. (PGCIL) * **Respondents:** Bihar State Power (Holding) Company Ltd. & Others * **Subjects:** * **Petition 189/TT/2025:** Truing up transmission tariff (2019–24) & determining tariff (2024–29) for assets under *Common Transmission System for Phase-II Generation Projects in Odisha*. * **Petition 378/TT/2025:** Same […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition for Truing up and determination of the transmission tariff of CERC (Conduct of Business) and (Terms and Condition of Tariff Regulations) with Western Region Strengthening Scheme VI – EQ

Summary: — ## **Central Electricity Regulatory Commission – Daily Order** **Case Title:** *Power Grid Corporation of India Ltd. (PGCIL) vs. Madhya Pradesh Power Management Co. Ltd. (MPPMCL) & Ors.* **Petition No.:** 26/TT/2025 **Date of Order:** 30 July 2025 **Bench (Coram):** Shri Jishnu Barua (Chairperson), Shri Ramesh Babu V. (Member), Shri Harish Dudani (Member), Shri Ravinder […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Petition for Truing up and determination of transmission tariff for Nagarjunasagar Sub-station (Conduct of Business) and (Terms and Condition of Tariff Regulations) – EQ

Summary: — ## ⚖️ **Petition Summary** * **Petition No.**: 487/TT/2025 * **Filed by**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Tamil Nadu Generation and Distribution Corporation Ltd. and 13 others * **Date of Hearing**: 22 July 2025 * **Project**: * **Asset**: 315 MVA ICT-III at Nagarjunasagar Sub-station (Southern Region) * **Scope**: Including associated […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ