1. Home
  2. Tag "Tranche-III"

Petition for Adoption of usage charges for a 1000 MW Solar PV power station (Tranche-III) connected to the ISTS scheme phase-II by the Central Government – EQ

Summary: — #### 1. Core Business Matter – **Prayer:** Adoption of **usage charges** for a **1000 MW Solar PV Power Station** (Tranche-III) under the **CPSU Scheme Phase-II** (Government Producer Scheme) via competitive bidding. – **Bidding Authority:** IREDA (replaced SECI per MNRE OM dated 13.04.2020) – **Legal Basis:** Section 63 of the Electricity Act, 2003 (tariff […]

Petition of the Power Purchase Agreement executed between Eden Renewable Alma Private Ltd. and Solar Energy Corporation of India Ltd. for Change in Law events – EQ

Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP – EQ

Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP For more information please see below link:

Petition of the Power Purchase Agreement executed between Eden Renewable Alma Private Ltd. and Solar Energy Corporation of India Ltd. for Change in Law events – EQ

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector – EQ

Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector For more information please see below link:

Petition of the Power Purchase Agreement executed between Eden Renewable Alma Private Ltd. and Solar Energy Corporation of India Ltd. for Change in Law events – EQ