Summary: — #### 1. Core Business Matter – **Prayer:** Adoption of **usage charges** for a **1000 MW Solar PV Power Station** (Tranche-III) under the **CPSU Scheme Phase-II** (Government Producer Scheme) via competitive bidding. – **Bidding Authority:** IREDA (replaced SECI per MNRE OM dated 13.04.2020) – **Legal Basis:** Section 63 of the Electricity Act, 2003 (tariff […]
Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP For more information please see below link:
Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector For more information please see below link:
The last date for submission of bids is October 29, 2020 RfS for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-III) Tender Value in ₹ 60,00,00,000 For more information please see below link: