Supply of Solar PV Power Plants on turn-key basis in Tripura Design, manufacture, supply, erection, testing and commissioning of Solar PV Power Plants on turn-key basis including Warranty / Guarantee and AMC for 5 (five) years from the date of commissioning in various Government installations in Tripura The last date to submit the bids is […]
IFB for selection of EPC contractor for Development of 2 MW Solar PV Project at Agartala Airport, in the State of Tripura The last date to submit the bids is February 22, 2021 For more information please see below link:
West Bengal gets 84 percent of its thermal power from coal-based plants that are yet to comply with sulphur dioxide emission norms notified by the Environment Ministry, CSE said West Bengal gets 84 percent of its thermal power from coal-based plants that are yet to comply with sulphur dioxide emission norms notified by the Environment […]
In the Matter Of: Petition for determination of prefixed levelised tariff for purchase of Solar Power by Tripura State Electricity Corporation Limited from decentralized Solar Power Plants and other Renewable Energy Generating Plant of Farmer / Developer having capacity of 500 kw to 2000 kw in the vicinity of Rural grid Sub-Station under Component-A of […]
TERC permits the Petitioner to install 2 MW Solar Power Plant in phase-I for Agartala Airport, as per technical specifications submitted by them to this Commission. The Commission has a Power to Relax under Part F – Clause 18 of TERC (Net metering for grid interactive rooftop solar systems) Regulations 2016, and this Commission may […]
The Tripura government has decided to provide 6, 00,000 environment-friendly Solar Study Lamps (SSL) to students belonging to poor families. A Tripura Renewable Energy Development Agency (TREDA) official said the Union Ministry of New and Renewable Energy (MNRE) sponsored SSL scheme, 80 per cent of the fund was borne by the central government and the […]
Design, manufacture, supply, erection, testing, commissioning for solarization of 1300 nos. grid connected 2 HP Agriculture Pumps in Tripura on turn-key basis and providing mandatory Annual Maintenance Contract for 5 (five) years including insurance coverage for the installed systems. For more information please see below link:
Limited Tender for Renewal of Insurance Policy for the Assets of 5 MW Grid Interactive Solar PV Power Project, Monarchak, Tripura for a period of 1(one) year w.e.f. 00.00.00 Hours of 26.05.2019. For more information please see below link: