Petition for Determination of Tariff For the Captive 4 MW Capacity Non-Conventional Mini Hydel Project

Petition for determination of tariff for the captive 4 MW capacity non-conventional mini hydel project and seeking directions to respondents to procure power from the Petitioner project. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition For Determination of Tariff For the Supply of Electricity Generated From 25 MW Geothermal Energy by the Applicant

Petition For Determination of Tariff For the Supply of Electricity Generated From 25 MW Geothermal Energy by the Applicant. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

MPERC Determined Pre Fixed Levelized Tariff of Rs. 3.07/kWh for KUSUM Scheme Solar Projects

MPERC Determined Pre Fixed Levelized Tariff of Rs. 3.07/kWh for KUSUM Scheme Solar Projects In the matter of petition for determination of Feed-in-Tariff for sale of power from decentralized solar power plants having capacity of 500 kW to 2MW to be set up under Component-A of the Pradhan Mantri Kisan Urja Surakhsha Evam Utthan Mahabhiyan […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Tamil Nadu Discom Extended Date for Suggestions on TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020

Tamil Nadu Discom Extended Date for Suggestions on TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020 Last date for receiving Comments/Suggestions is Extended upto 19.02.2021 before 5pm. Commission invites Comments/Suggestions from all the stakeholders on Draft TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020 on or before 19.01.2021 before 5 PM. […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Commission issues (NET METERING ROOFTOP SOLAR PV GRID INTERACTIVE SYSTEMS) FIRST AMENDMENT REGULATION, 2020

  Commission issues (NET METERING ROOFTOP SOLAR PV GRID INTERACTIVE SYSTEMS) FIRST AMENDMENT REGULATION, 2020. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Commission invites Comments on Draft TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020 

Commission invites Comments/Suggestions from all the stakeholders on Draft TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020 on or before 19.01.2021 before 5 PM Preamble: The Commission with an objective to maintain grid discipline and grid security as per provisions of IEGC and State Electricity Grid Code and to enforce standards with respect […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ