1. Home
  2. Tag "Wind-solar"

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 771/AT/2025 – **Subject**: Petition under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects** connected to the **inter-State Transmission System (ISTS)**, selected through competitive bidding. – **Petitioner**: **NTPC Limited** – **Respondents**: **Adani Renewable Energy Holding Twelve Limited […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — #### **1. Case Overview** * **Petition Number:** 771/AT/2025 * **Petitioner:** **NTPC Limited** * **Legal Basis:** Filed under **Section 63 of the Electricity Act, 2003**. This section deals with the adoption of tariff discovered through a transparent process of competitive bidding. * **Subject:** The petition seeks the **adoption of tariff** for **1200 MW Wind-Solar […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

UPERC Approves 300 MW Wind-Solar Hybrid Power Purchase to Boost Uttar Pradesh’s Clean Energy Goals – EQ

In Short : The Uttar Pradesh Electricity Regulatory Commission (UPERC) has approved the purchase of 300 MW of hybrid renewable power by UPPCL at a tariff of ₹3.56 per unit. The project, combining wind and solar energy, aims to enhance renewable integration in the state, support grid stability, and accelerate Uttar Pradesh’s clean energy transition while […]

Amid Battery Boom, Graphite Mining Gains Renewed Attention in the United States – EQ

Petition for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects Including Storage and evacuation of power from its 6 MW Hybrid Power Plant being Force Majeure events – EQ

Summary: — ### ⚖️ **Case Overview** * **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar * **Petitioner:** *Opera Engitech Pvt. Ltd.*, Jamnagar, Gujarat * **Respondent:** *Gujarat Energy Transmission Corporation Ltd. (GETCO)*, Vadodara * **Coram:** Mehul M. Gandhi (Member) & S.R. Pandey (Member) * **Date of Order:** 29 September 2025 — ### 🧾 **Nature of Petition** The […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — ### **1. Background** **NTPC Limited (NTPCL)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003** seeking **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects**, with a **Greenshoe Option** for an additional capacity of up to **600 MW**. The projects are connected to […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition for Adoption for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (HYBRID-3) in India – EQ

Summary: — ## ⚖️ **Document Overview** * **Issuing Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Document Type:** *Record of Proceedings (RoP)* * **Petition No.:** 684/AT/2025 * **Date of Hearing:** *18 September 2025* * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition of Adoption of Tariff for long term procurement of 780 MW Wind – Solar Hybrid Power from NTPC – EQ

Summary: — ## **Case Details** * **Commission:** Maharashtra Electricity Regulatory Commission (MERC) * **Petitioner:** *Maharashtra State Electricity Distribution Company Ltd. (MSEDCL)* * **Respondent:** *NTPC Ltd.* * **Case No.:** 123 of 2024 * **Order Date:** 10 September 2025 — ## **Petition Summary** * **Objective:** Approval for long-term procurement of **780 MW Wind–Solar Hybrid Power** from NTPC […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition for Adoption of Tariff for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (HYBRID-3) – EQ

Summary: — ## **Case Summary – SJVN Tariff Adoption (Hybrid-3 Project)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 684/AT/2025 **Date of Hearing:** 12 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Case Background** * **Petitioner:** SJVN […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition of Tariff Framework for Procurement of Power from Wind-Solar Hybrid Projects including storage of occurrences and circumstances – EQ

Summary: — ## **Gujarat Electricity Regulatory Commission – Daily Order** **Case Title:** *Opera Engitech Pvt. Ltd. vs. Gujarat Energy Transmission Corporation Ltd. (GETCO)* **Petition No.:** 2470 of 2025 **Date of Order:** 19 July 2025 **Bench:** Shri Mehul M. Gandhi (Member), Shri S. R. Pandey (Member) **Location:** Gandhinagar — ### **Matter** Petition filed under **Section 86 […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ

Petition of the Electricity Act from Wind-Solar Hybrid Projects Including Storage its 6 MW Hybrid Power Plant being Force Majeure events – EQ

Summary: — ## **Gujarat Electricity Regulatory Commission – Daily Order** **Case Title:** *M/s Opera Engitech Pvt. Ltd. vs. Gujarat Energy Transmission Corporation Ltd. (GETCO)* **Petition No.:** 2470 of 2025 **Date of Order:** 05 August 2025 **Bench:** Shri Mehul M. Gandhi (Member), Shri S. R. Pandey (Member) **Location:** Gandhinagar — ### **Matter** Petition filed under **Section […]

Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 – EQ