Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro November 29, 2021 Anand Gupta 000 Policy & Regulation Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System. For more information please see below link: Read more In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ