Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro
Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System.
For more information please see below link:





