Petition for adoption of tariff for the 970 MW Wind Power Projects connected to the Inter-State Transmission System (ISTS) – EQ Mag Pro
Petition for adoption of tariff for the 970 MW Wind Power Projects connected to the Inter-State Transmission System (ISTS).
For more information please see below link:





