1. Home
  2. Tag "Wind-solar"

Petition of the Electricity Act from Wind-Solar Hybrid Projects Including Storage its 6 MW Hybrid Power Plant being Force Majeure events – EQ

Summary: — ## **Gujarat Electricity Regulatory Commission – Daily Order** **Case Title:** *M/s Opera Engitech Pvt. Ltd. vs. Gujarat Energy Transmission Corporation Ltd. (GETCO)* **Petition No.:** 2470 of 2025 **Date of Order:** 05 August 2025 **Bench:** Shri Mehul M. Gandhi (Member), Shri S. R. Pandey (Member) **Location:** Gandhinagar — ### **Matter** Petition filed under **Section […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition of the GERC (Conduct of Business) Regulations of the evacuation infrastructure for commissioning of the entire capacity of 25 MW of Wind- Solar Hybrid Power – EQ

Petition of the GERC (Conduct of Business) Regulations of the evacuation infrastructure for commissioning of the entire capacity of 25 MW of Wind- Solar Hybrid Power For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

NLC India Bags 450 MW Wind–Solar Hybrid Project from NTPC – EQ

In Short : Bangladesh has paid $384 million to Adani Power, easing dues under a 2017 power supply deal amid financial strain. The payment reduces total outstanding bills to around $500 million. Adani had earlier cut power supply due to non-payment, later restoring it in March 2025. Disputes over coal pricing and plant capacity remain, […]

TotalEnergies Shifts $1 Billion Investment from Offshore Wind to Expand U.S. Oil and Gas Output – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects with ‘Green-Shoe Option” under by Ministry of Power, Govt. of India – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects with ‘Green-Shoe Option” under by Ministry of Power, Govt. of India For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX) – EQ

Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX) For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Adoption of Tariff discovered for procurement of power from the 1200 MW ISTS-Connected Wind- Solar Hybrid Power Projects – EQ

Petition for Adoption of Tariff discovered for procurement of power from the 1200 MW ISTS-Connected Wind- Solar Hybrid Power Projects For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for ‘Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects including Storage for the State of Gujarat’ for evacuation of power from its 70 MW Hybrid Power Plant – EQ

Petition for ‘Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects including Storage for the State of Gujarat’ for evacuation of power from its 70 MW Hybrid Power Plant For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects 70 MW Hybrid Power Plant located at Village Dwarka, Gujarat – EQ

Petition for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects 70 MW Hybrid Power Plant located at Village Dwarka, Gujarat For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Adoption of tariff for 600 MW inter-state Transmission System connected Wind-Solar Hybrid Power Projects (SECI ISTS IX) – EQ

Petition for Adoption of tariff for 600 MW inter-state Transmission System connected Wind-Solar Hybrid Power Projects (SECI ISTS IX) For more information please see below link:

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ